楼主 |
发表于 2009-1-7 20:22:50
|
显示全部楼层
http://einstein.phys.uwm.edu/for ... p;nowrap=true#93692
Hi Gary!
Yes, with a bit of luck (i.e. if we don't find a problem in the very last minute) we'll start S5R5 around the weekend. We were just waiting for a green light that we got last night.
这周末s5r5就要开始了~终于。。。
Due to some remaining uncertainties we will restrict the frequency range of S5R5 to 1000Hz and then take a look at the results to decide whether we should push it up to the 1250Hz of the current S5R4. This reduces the projected total runtime of (the possibly first part of) S5R5 to about 6 months. We are working on some hoefully even more sensitive and efficient analysis methods (improving the "Hough transform"). If a new program is ready to be used by then, we'll also not extend S5R5, but start an S5R6.
由于一些非确定性的原因,s5r5的频率范围将限制在1000hz以下,根据其结果决定是否要上升到s5r4的1260hz。这样的话s5r5的持续时间将是6个月左右。我们也在试验一些更灵敏更有效的分析方法,如果有新的程序要使用,s5r5也不会延长,而是从s5r6开始。
The only consequence of this decision right now is that clients currently running S5R4 workunits above 1000Hz will need to get a new set of data files, while the others will just get S5R5 work for the data files they already have.
如果用户当前正在算1000hz以上的s5r4任务,到时将会自动下载一些新的数据文件,其它用户将仍可以继续使用本地已有的数据文件。
We'll stop the S5R4 workunit generator, but the workunits generated so far will be finished and credited. I'm not sure that pushing the last ones through is necessary, so I probably won't put time into this.
s5r4的任务将停止生成,已生成的任务将继续完成并授予积分。
There is no (intentional) change in the crediting, so wrt the credit it shouldn't matter whether you run S5R4 or S5R5 workunits. The S5R5 ones will run a bit shorter (design goal was 50%, but I'm afraid with the adjustments we had to make afterwards we missed it by about 10%).
新阶段的任务在得分方面保持不变,但任务的计算时间将减少。
BM |
|