Large Hadron Collider delayed
Scientists happy with extra time to tweak their instruments.

The particle-smashing project designed to look for the mysterious particle that gives objects mass will not be seeing any live action this year.

The Large Hadron Collider (LHC), based at CERN in Geneva, Switzerland, was due to do a trial run in November this year, before switching on the scientific search for the Higgs boson in 2008. The test run would have seen a proton beam passing through the accelerator without actually being accelerated. But a number of setbacks — not least the spectacular failure earlier this year of some of the LHC's critical magnets — have led to a reassessment of the schedule, and the cancellation of the test run.

The news is not yet official, but is "probably true" according to CERN spokesman James Gillies. No formal announcement will be made until CERN's council next meets on 22 June, he says.

The delay doesn't come as a huge surprise, says Lyndon Evans, project manager at the LHC. "I've been making it pretty clear for a while we will not be ready to do this engineering run," he says.

Nor is it all bad news. The scientists who will be performing their search for the Higgs boson when the machine is finally up and running next year are perfectly happy with the cancellation of the engineering test, Evans claims. During the test run the instruments would have been off-limits for the scientists, putting more pressure on an already tight schedule. This way they can continue to work on them.

The down side is that in April or May 2008, when the science does start, there will have been no chance to see if there were any glitches in getting a full beam. "The purpose of the engineering run was to have an early warning of any problems," says Evans. "I would have preferred to have a beam in the machine."

But the test is by no means critical. And by the time all the instrumentation and hardware has been installed it will be well worth turning the beam on full and collecting data, they say — even if it isn't running perfectly. They will have just missed out on a ribbon-cutting ceremony for 2007.

There is still a possibility that a portion of the particle accelerator will be tested this year — the proton beam may be turned on, but not accelerated, in just one section of the LHC. But even that is looking unlikely, especially if running the test means the final switch-on date has to be pushed back. "It is getting so close to our start-up time that the sector test becomes marginal," says Evans. "We will do nothing to delay our final goal."

In the meantime, there is a chance that a competing US instrument at Fermilab might spot the Higgs boson before the LHC turns on.



大意:
原本定于今年11月进行一次整体试机,但由于先前的磁体缺陷,今年的试机很可能取消,而且项目可能不得不延期至明年4~5月开机。
不过官方暂时没有发布该公告,具体消息将于6月22日的委员会讨论会后公布。

[ 本帖最后由 vmzy 于 2007-6-6 14:54 编辑 ]
回复

使用道具 举报

发表于 2007-6-9 09:54:46 | 显示全部楼层
消息来源准确吗
回复

使用道具 举报

发表于 2007-6-10 02:05:48 | 显示全部楼层
原帖由 lch=gta 于 2007-6-9 09:54 发表
消息来源准确吗

~~~有原PO來源  去參考囉
該不會亂謅
回复

使用道具 举报

发表于 2007-6-11 21:25:55 | 显示全部楼层
肯定准确!据报道,试机时发生了爆炸,工作人员还被紧急疏散了。
回复

使用道具 举报

发表于 2007-6-11 21:30:51 | 显示全部楼层
原帖由 refla 于 2007-6-11 21:25 发表
肯定准确!据报道,试机时发生了爆炸,工作人员还被紧急疏散了。

那个我也有耳闻

似乎是什么磁体爆炸?

[ 本帖最后由 lch=gta 于 2007-6-11 21:32 编辑 ]
回复

使用道具 举报

发表于 2007-6-11 21:31:59 | 显示全部楼层
这样的话,就没事了

我还以为我们正在搬迁的服务器发生事故呢……

看来不会影响我们算吧
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 新注册用户

本版积分规则

论坛官方淘宝店开业啦~
欢迎大家多多支持基金会~

Archiver|手机版|小黑屋|中国分布式计算总站 ( 沪ICP备05042587号 )

GMT+8, 2024-5-4 13:39

Powered by Discuz! X3.5

© 2001-2024 Discuz! Team.

快速回复 返回顶部 返回列表